Industrial Pump Installation





Project Overview
ALMEC Services successfully completed a comprehensive industrial pump system installation for a major manufacturing facility in Sheffield. This project involved the installation of high-capacity centrifugal pumps, complete piping systems, and advanced control mechanisms to enhance the facility's production capabilities and ensure reliable fluid management throughout their operations.
Project Specifications
- Client: Sheffield Manufacturing Ltd
- Duration: 6 weeks
- Services: Pump Installation, Piping, Control Systems
- Equipment: 3x Centrifugal Pumps (500 GPM), Control Panels, VFD Systems
The Challenge
The client required a complete overhaul of their aging pump system without disrupting ongoing production. The new system needed to handle increased capacity while providing better energy efficiency and remote monitoring capabilities. Working in an active manufacturing environment posed additional safety and scheduling challenges.
Our Solution
Our team developed a phased installation approach that allowed the facility to maintain production during the upgrade. We installed modern variable frequency drives (VFDs) for optimal energy efficiency and implemented a sophisticated control system with remote monitoring capabilities. All work was completed during scheduled maintenance windows to minimize disruption.
Results & Benefits
- 35% improvement in energy efficiency
- Zero production downtime during installation
- Remote monitoring system implemented
- Increased pumping capacity by 50%
- Reduced maintenance requirements by 40%